Custom Software for Factories
Custom software for factories: MES, WMS, quality, IoT and digital twin.
Production software, WMS, QMS, CMMS, EMS, IoT integration and digital twin projects. Active projects across Turkish industrial zones. Typical gains: OEE +8–18%, unplanned downtime −20–50%, energy −8–15%.
Capabilities
MES: Manufacturing Execution
Work orders, workstations, traceability, OEE, scrap, shifts. Goodbye paper/Excel.
WMS: Warehouse Management
Multi-site, barcode + RFID, FIFO/FEFO, ASRS integration.
QMS: Quality
Incoming/in-process/outgoing inspection, SPC, NCR, CAPA, audit prep (IATF 16949, ISO 9001).
CMMS + Predictive
Planned maintenance, breakdown tracking, spare stock, vibration/temp sensor predictive.
EMS: Energy
Machine-level consumption, alarms, 8–15% annual energy savings.
Digital Twin & Simulation
Three.js / Unity WebGL plant twin, bottleneck prediction, what-if simulation.
IoT Gateway
OPC UA, MQTT, Modbus; edge gateway (AWS IoT Greengrass / Azure IoT Edge); realtime dashboards.
Shop-Floor Tablet App
React Native offline-first app: operator control, QC reports, downtime reasons, suggested actions.
Vertical experience
- Automotive tier-1 (IATF 16949, JIT)
- Textile (color, batch, recipe, dye-house energy)
- Food (HACCP, traceability, expiry)
- Machinery & metal (project + serial)
- Chemistry & pharma (recipe + lot + GMP)
- Appliances & electronics (high-volume assembly)
- Logistics & 3PL (WMS + TMS + cross-dock)
- Export-oriented manufacturing (multi-localization, customs)
FAQ
How do you price factory and MES software projects?
Budget is driven by module scope (MES, WMS, QMS, CMMS), machine/line count, PLC/SCADA integration complexity, and IEC 62443 security standards. Pilot line builds range from $25,000–$80,000; plant-wide integrated systems range from $80,000–$300,000+.
Which industrial zones do you actively serve?
We actively deploy in Bursa, Kocaeli/GOSB, Gaziantep, Denizli, Konya, Kayseri, Manisa, and Istanbul industrial zones, with on-site engineering visits standard.
How do you integrate with legacy and modern PLCs/SCADA?
We deploy OPC UA, MQTT, Modbus, and Siemens S7 communication backbones across Siemens, Schneider, Omron, Beckhoff PLCs, and Ignition/WinCC SCADA suites.
What is your roadmap from pilot line to full facility rollout?
Our 12-month reference timeline: 2mo discovery & value-stream mapping, 3mo MVP development, 2mo pilot line training & validation, 5mo multi-line plant-wide rollout.
What capabilities does your custom MES system deliver?
Real-time work order tracking, cycle time analysis, raw material traceability, automated OEE analytics, scrap tracking, and automated shift handover reporting.
How are WMS and ERP inventory synchronization configured?
Multi-facility inventory tracking, FIFO/FEFO logic, barcode/RFID scanners, automated warehouse cranes (ASRS), and bidirectional ERP sync with SAP, IFS, and Microsoft Dynamics.
How does predictive maintenance (CMMS + IoT) prevent downtime?
Vibration, thermal, and amperage telemetry feed anomaly detection ML models, flagging imminent mechanical failures 48 to 120 hours in advance.
What is included in Quality Management (QMS) & SPC?
Incoming/in-line/outgoing inspection, Statistical Process Control (SPC), non-conformance reports (NCR), CAPA tracking, and IATF 16949 / ISO 9001 compliance logs.
What savings does Energy Management (EMS) generate?
Machine-level energy and compressed air metering with anomaly alerts typically generates 8–15% annual electricity cost reductions.
How do you enforce IEC 62443 OT cybersecurity and GDPR?
We establish IT/OT network segmentation (DMZ), TLS 1.3 encryption, role-based access control, tamper-evident audit logs, and secure data diodes.
Do you supply mobile and rugged tablet apps for floor technicians?
Yes. We build offline-first React Native tablet and scanner applications optimized for harsh manufacturing floor environments.
Can the factory software be hosted strictly on-premise?
Yes. We deploy on isolated on-premise edge servers with zero external internet dependencies for air-gapped security.
Do clients receive complete source code ownership?
Yes. 100% of source code, schemas, and integration APIs are transferred upon final acceptance with zero vendor lock-in.
How do we schedule an on-site factory discovery audit?
Schedule a consultation at **calendar.makrops.com/info/gorusme** to arrange an on-site technical inspection by our industrial engineering squad.
Let us visit your plant.
Free plant visit + process mapping. Initial assessment report within 48h.
Request Plant Visit